{"id":7986,"date":"2021-11-06T16:45:34","date_gmt":"2021-11-06T16:45:34","guid":{"rendered":"http:\/\/3.26.62.22\/?post_type=ht_kb&#038;p=7986"},"modified":"2021-11-06T16:45:34","modified_gmt":"2021-11-06T16:45:34","slug":"critical-path-settings","status":"publish","type":"ht_kb","link":"http:\/\/help.gjgardner.com\/au\/hc\/setup\/schedule-settings\/critical-path-settings\/","title":{"rendered":"Critical Path Settings"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Construction Critical Paths (CCP&#8217;s) are major stages of construction that you may want to monitor on a week-to-week basis. Normally, you would have 5 to 10 stages in your Critical Path. The Construction Critical Path is comprised of Cost Centers that determine the sequence of construction operations. <\/span><\/p>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">To manage Construction Critical Paths, on the navigational sidebar, select <\/span><b>Setup<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Once the Setup section expands, select <\/span><b>Schedules<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the tabbed menu, select <\/span><b>Critical Path<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><\/ol>\n\n\n\n<p><span style=\"font-weight: 400;\">The page with the list of Construction Critical Paths opens as follows:<\/span><\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" width=\"1396\" height=\"851\" src=\"https:\/\/builder-help.gjgardner.com\/wp-content\/uploads\/2019\/03\/setup-schedules-critical-path.png\" alt=\"\" class=\"wp-image-1069\" srcset=\"https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/setup-schedules-critical-path.png 1396w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/setup-schedules-critical-path-300x183.png 300w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/setup-schedules-critical-path-1024x624.png 1024w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/setup-schedules-critical-path-768x468.png 768w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/setup-schedules-critical-path-1200x732.png 1200w\" sizes=\"(max-width: 1396px) 100vw, 1396px\" \/><\/figure><\/div>\n\n\n\n<p><span style=\"font-weight: 400;\">The Construction Critical Path is comprised of the three blocks, as follows:<\/span><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><b>Construction Critical Path list<\/b><\/td><td><span style=\"font-weight: 400;\">Shows the list of Construction Critical Paths.<\/span><\/td><\/tr><tr><td><b>Cost Centers (Tasks) list<\/b><\/td><td><span style=\"font-weight: 400;\">Shows the list of Cost Centers (Tasks) associated with the selected Construction Critical Path.<\/span><\/td><\/tr><tr><td><b>Unused Cost Centers list<\/b><\/td><td><span style=\"font-weight: 400;\">Shows the list of Cost Centers that are not used in the selected Construction Critical Path.<\/span><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><span style=\"font-weight: 400;\">For each Construction Critical Path, the following information is displayed:<\/span><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><b>Name<\/b><\/td><td><span style=\"font-weight: 400;\">Name of the Construction Critical Path.<\/span><\/td><\/tr><tr><td><b>Slab<\/b><\/td><td><span style=\"font-weight: 400;\">Flag that the Construction Critical Path is Slab.<\/span><\/td><\/tr><tr><td><b>Substitute With<\/b><\/td><td><span style=\"font-weight: 400;\">When a Critical Path Stage is deleted you must provide another Critical Path Stage to Substitute it with.<\/span><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><span style=\"font-weight: 400;\">You can perform the following operation on Construction Critical Paths:<\/span><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">add new Construction Critical Path stages<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">edit the existing Construction Critical Path stages<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">delete the no longer needed Construction Critical Path stages<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">undelete the deleted Construction Critical Path stages<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">associate Cost Centers with Construction Critical Path stages<\/span><\/li><\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><b>Adding a Construction Critical Path Stage<\/b><\/h3>\n\n\n\n<ol class=\"wp-block-list\"><li><span style=\"font-weight: 400;\">Above the list with Construction Critical Path stages, locate and click the <\/span><b>Create&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-910 alignnone\" src=\"https:\/\/builder-help.gjgardner.com\/wp-content\/uploads\/2019\/03\/add-task-icon.png\" alt=\"\" width=\"16\" height=\"20\"><\/b><span style=\"font-weight: 400;\"> icon.<\/span><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1070\" src=\"https:\/\/builder-help.gjgardner.com\/wp-content\/uploads\/2019\/03\/add-critical-path-stage-form.png\" alt=\"\" width=\"450\" height=\"400\" srcset=\"https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/add-critical-path-stage-form.png 450w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/add-critical-path-stage-form-300x267.png 300w\" sizes=\"(max-width: 450px) 100vw, 450px\" \/><\/li><li><span style=\"font-weight: 400;\">In the <\/span><b>Add Critical Path Stage<\/b><span style=\"font-weight: 400;\"> form, enter the name of the Critical Path stage.<\/span><\/li><li><span style=\"font-weight: 400;\">When complete, click <\/span><b>Save<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><li><span style=\"font-weight: 400;\">Click <\/span><b>Process<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><b>Editing the Construction Critical Path Stage<\/b><\/h3>\n\n\n\n<p><span style=\"font-weight: 400;\">When you update names of Construction Critical Path stages, they will be updated throughout the system (for example, in Job Schedules, Schedule Templates).<\/span><\/p>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the list with Construction Critical Path stages, locate the one you want to edit.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Hover over the Construction Critical Path stage until the action icons appear.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Click the <\/span><b>Edit&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-188 alignnone\" src=\"https:\/\/builder-help.gjgardner.com\/wp-content\/uploads\/2019\/02\/edit-icon.png\" alt=\"\" width=\"15\" height=\"15\"><\/b> <span style=\"font-weight: 400;\"> icon.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">In the <\/span><b>Edit Critical Path Stage<\/b><span style=\"font-weight: 400;\"> form, make the appropriate modifications.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Click <\/span><b>Save<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">When complete, click <\/span><b>Process<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><b>Deleting the Construction Critical Path Stage<\/b><\/h3>\n\n\n\n<p><span style=\"font-weight: 400;\">You can delete Construction Critical Path stages that are not used in the system (for example, in Job Schedules, Schedule Templates).<\/span><\/p>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the list with Construction Critical Path stages, locate the one you want to delete.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Hover over the Construction Critical Path stage until the action icons appear<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Click the <\/span><b>Delete&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-206 alignnone\" src=\"https:\/\/builder-help.gjgardner.com\/wp-content\/uploads\/2019\/02\/delete-icon.png\" alt=\"\" width=\"12\" height=\"16\"><\/b> <span style=\"font-weight: 400;\"> icon.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Confirm the removal of the Construction Critical Path stage.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">If this Stage has been used you must provide another Critical Path Stage to Substitute it with.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">When complete, click <\/span><b>Process<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><b>Undeleting the Construction Critical Path Stage<\/b><\/h3>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Above the list with Construction Critical Path stages, locate the <\/span><b>Show deleted<\/b><span style=\"font-weight: 400;\"> toggle.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">To show deleted stages, move the toggle right.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the list locate the deleted Construction Critical Path stage you want to undelete. It will be highlighted with the red Deleted label.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Hover over the Construction Critical Path stage until the action icons appear.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Click the <\/span><b>Undelete&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-557 alignnone\" src=\"https:\/\/builder-help.gjgardner.com\/wp-content\/uploads\/2019\/03\/mark-deleted-icon.png\" alt=\"\" width=\"18\" height=\"14\"><\/b> <span style=\"font-weight: 400;\"> icon.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">When complete, click <\/span><b>Process<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><b>Managing Order of Stages in the Construction Critical Path<\/b><\/h3>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the list with Construction Critical Path stages, locate the one which position on the list you want to change.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Drag the&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-665 alignnone\" src=\"https:\/\/builder-help.gjgardner.com\/wp-content\/uploads\/2019\/03\/draggable-icon.png\" alt=\"\" width=\"9\" height=\"15\">&nbsp;<\/span><span style=\"font-weight: 400;\">part of the row to the appropriate position on the list.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">When complete, click <\/span><b>Process<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><b>Managing Cost Centers in Construction Critical Path Stages<\/b><\/h3>\n\n\n\n<p><span style=\"font-weight: 400;\">You can manage Cost Centers in the Construction Critical Path stages, as follows:<\/span><\/p>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">add Cost Centers from the Unused Cost Centers list into the Cost Centers (Tasks) list<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">remove Cost Centers from the Cost Centers (Tasks) list<\/span><\/li><\/ol>\n\n\n\n<p><b>To add a Cost Center into the Cost Centers (Tasks) list:<\/b><\/p>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Select the Construction Critical Path stage.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the Unused Cost Centers list, locate the Cost Center you want to add.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Hover over the Cost Center until the action icon appears.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Click the <\/span><b>Move to CC (Tasks)&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1071 alignnone\" src=\"https:\/\/builder-help.gjgardner.com\/wp-content\/uploads\/2019\/03\/move-cc-task-icon.png\" alt=\"\" width=\"12\" height=\"18\"><\/b> <span style=\"font-weight: 400;\"> icon.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">When complete, click <\/span><b>Process<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><\/ol>\n\n\n\n<p><b>To remove a Cost Center from the Cost Centers (Tasks) list:<\/b><\/p>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Select the Construction Critical Path stage.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the Cost Centers (Tasks) list, locate the Cost Center you want to remove.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Hover over the Cost Center until the action icon appears.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Click the <\/span><b>Move to Unused CC&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1071 alignnone\" src=\"https:\/\/builder-help.gjgardner.com\/wp-content\/uploads\/2019\/03\/move-cc-task-icon.png\" alt=\"\" width=\"12\" height=\"18\"><\/b> <span style=\"font-weight: 400;\"> icon.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">When complete, click <\/span><b>Process<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><\/ol>\n\n\n\n<p><b>To locate the Cost Center on the list:<\/b><\/p>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Click the <\/span><b>Go To&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-308 alignnone\" src=\"https:\/\/builder-help.gjgardner.com\/wp-content\/uploads\/2019\/03\/find-icon.png\" alt=\"\" width=\"18\" height=\"18\"><\/b> <span style=\"font-weight: 400;\"> icon.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">In the appeared search box, enter the number of the Cost Center you look for.<\/span><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1072\" src=\"https:\/\/builder-help.gjgardner.com\/wp-content\/uploads\/2019\/03\/critical-path-go-to-cc.png\" alt=\"\" width=\"510\" height=\"406\" srcset=\"https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/critical-path-go-to-cc.png 510w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/critical-path-go-to-cc-300x239.png 300w\" sizes=\"(max-width: 510px) 100vw, 510px\" \/><\/li><\/ol>","protected":false},"excerpt":{"rendered":"<p>Construction Critical Paths (CCP&#8217;s) are major stages of construction that you may want to monitor on a week-to-week basis. Normally, you would have 5 to 10 stages in your Critical Path. The Construction Critical Path is comprised of Cost Centers that determine the sequence of construction operations. To manage Construction&#8230;<\/p>","protected":false},"author":21,"comment_status":"open","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"ht-kb-category":[222],"ht-kb-tag":[],"class_list":["post-7986","ht_kb","type-ht_kb","status-publish","format-standard","hentry","ht_kb_category-schedule-settings"],"_links":{"self":[{"href":"https:\/\/help.gjgardner.com\/au\/wp-json\/wp\/v2\/ht-kb\/7986"}],"collection":[{"href":"https:\/\/help.gjgardner.com\/au\/wp-json\/wp\/v2\/ht-kb"}],"about":[{"href":"https:\/\/help.gjgardner.com\/au\/wp-json\/wp\/v2\/types\/ht_kb"}],"author":[{"embeddable":true,"href":"https:\/\/help.gjgardner.com\/au\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/help.gjgardner.com\/au\/wp-json\/wp\/v2\/comments?post=7986"}],"version-history":[{"count":1,"href":"https:\/\/help.gjgardner.com\/au\/wp-json\/wp\/v2\/ht-kb\/7986\/revisions"}],"predecessor-version":[{"id":7987,"href":"https:\/\/help.gjgardner.com\/au\/wp-json\/wp\/v2\/ht-kb\/7986\/revisions\/7987"}],"wp:attachment":[{"href":"https:\/\/help.gjgardner.com\/au\/wp-json\/wp\/v2\/media?parent=7986"}],"wp:term":[{"taxonomy":"ht_kb_category","embeddable":true,"href":"https:\/\/help.gjgardner.com\/au\/wp-json\/wp\/v2\/ht-kb-category?post=7986"},{"taxonomy":"ht_kb_tag","embeddable":true,"href":"https:\/\/help.gjgardner.com\/au\/wp-json\/wp\/v2\/ht-kb-tag?post=7986"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}