{"id":1707,"date":"2019-04-18T19:01:58","date_gmt":"2019-04-18T19:01:58","guid":{"rendered":"https:\/\/builder-help.gjgardner.com\/?page_id=1707"},"modified":"2021-11-05T23:23:28","modified_gmt":"2021-11-05T23:23:28","slug":"job-bill-of-materials","status":"publish","type":"ht_kb","link":"http:\/\/help.gjgardner.com\/nz\/hc\/reports\/estimating-reports\/job-bill-of-materials\/","title":{"rendered":"Job Bill of Materials Report"},"content":{"rendered":"<p>The Job Bill of Materials report can show the list of Cost Centers (summary or detailed view) or the summary of all Take Off Parameters for a specific Job Estimate in the form of a Bill of Materials.<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>Open the library with reports.<\/li><li>Select <strong>Job Bill of Materials<\/strong>.<\/li><li>Define criteria for generating the report, as follows:<br>\n<table width=\"623\">\n<tbody>\n<tr>\n<td width=\"217\"><strong>House Plan<\/strong><\/td>\n<td width=\"406\">Select the Job which you want to generate the report for.<\/td>\n<\/tr>\n<tr>\n<td width=\"217\"><strong>Style<\/strong><\/td>\n<td width=\"406\">Select the style for generating the report, as follows:\n<p>&nbsp;<\/p>\n<p>\u25cf&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Summary<\/strong> \u2013 summary report listing all Cost Centers used in the Job.<\/p>\n<p>\u25cf&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Detail<\/strong> \u2013 detailed report listing all Cost Centers with Items and Components per each Cost Center.<\/p>\n<p>\u25cf&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <strong>Take Off Parameters<\/strong> \u2013 report listing all Take Off Parameters with their measurements for the Job<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/li><li>For each report, additional criteria for report generation may be applied, as follows:<br>\n<table width=\"623\">\n<tbody>\n<tr>\n<td colspan=\"2\" width=\"623\">\n<p style=\"text-align: center;\"><strong>SUMMARY<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"217\"><strong>Show Zero Cost Centers<\/strong><\/td>\n<td width=\"406\">Check the box to include the non-used Cost Centers into the report.<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" width=\"623\">\n<p style=\"text-align: center;\"><strong>DETAIL<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"217\"><strong>All Cost Centers<\/strong><\/td>\n<td width=\"406\">Check the box to include all Cost Centers into the report.<\/td>\n<\/tr>\n<tr>\n<td width=\"217\"><strong>Show Formula<\/strong><\/td>\n<td width=\"406\">Check the box to include the formula into the Item or Component description in the report.<\/td>\n<\/tr>\n<tr>\n<td width=\"217\"><strong>Show Cutting List<\/strong><\/td>\n<td width=\"406\">Check the box to include the cutting list into the report.<\/td>\n<\/tr>\n<tr>\n<td width=\"217\"><strong>Show Cost, UoM and Extension<\/strong><\/td>\n<td width=\"406\">Check the box to show cost, Units of Measure, and Extension per each Item and Component.<\/td>\n<\/tr>\n<tr>\n<td width=\"217\"><strong>Show Memo<\/strong><\/td>\n<td width=\"406\">Check the box to include the memo into the Item or Component description in the report.<\/td>\n<\/tr>\n<tr>\n<td width=\"217\"><strong>Show Parent Component<\/strong><\/td>\n<td width=\"406\">Check the box to show the parent Component for better record grouping.<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\" width=\"623\">\n<p style=\"text-align: center;\"><strong>TAKE OFF PARAMETERS<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"217\"><strong>Hide Zero Take Off Parameters<\/strong><\/td>\n<td width=\"406\">Check the box to hide Take Off Parameters that are not used in the Job.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<figure><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1708\" src=\"\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-options.png\" alt=\"\" width=\"297\" height=\"341\" srcset=\"https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-options.png 297w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-options-261x300.png 261w\" sizes=\"(max-width: 297px) 100vw, 297px\" \/><\/figure><p><\/p>\n<\/li><li>When complete, click <strong>Apply<\/strong>. The system generates the report.<\/li><\/ol>\n\n\n\n<p>For the Summary style, the report will look as follows:<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" width=\"1256\" height=\"793\" src=\"\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-summary.png\" alt=\"\" class=\"wp-image-1709\" srcset=\"https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-summary.png 1256w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-summary-300x189.png 300w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-summary-1024x647.png 1024w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-summary-768x485.png 768w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-summary-1200x758.png 1200w\" sizes=\"(max-width: 1256px) 100vw, 1256px\" \/><\/figure><\/div>\n\n\n\n<p>The report shows the following information:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Cost Center<\/strong><\/td><td>Number and name of the Cost Center.<\/td><\/tr><tr><td><strong>Cost<\/strong><\/td><td>Cost of the Cost Center in dollars. The zero cost Cost Centers can be excluded if the corresponding option was selected.<\/td><\/tr><tr><td><strong>Cost Percent<\/strong><\/td><td>Calculated percent of the Cost Center cost against the total cost of the Job Estimate.<\/td><\/tr><tr><td><strong>Cost per ft2<\/strong><\/td><td>Calculated cost per square feet\/meter of the House.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>For the Detail style, the report will look as follows:<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" width=\"1256\" height=\"792\" src=\"\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-detailed.png\" alt=\"\" class=\"wp-image-1710\" srcset=\"https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-detailed.png 1256w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-detailed-300x189.png 300w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-detailed-1024x646.png 1024w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-detailed-768x484.png 768w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-detailed-1200x757.png 1200w\" sizes=\"(max-width: 1256px) 100vw, 1256px\" \/><\/figure><\/div>\n\n\n\n<p>The report shows the following information:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Item<\/strong><\/td><td>Description of the Item or Component which may include the following:\n<p>&nbsp;<\/p>\n<ul>\n<li>Item or Component Code<\/li>\n<li>Item or Component Name<\/li>\n<li>Formula<\/li>\n<li>Cutting List (with multiple dimensions)<\/li>\n<li>Memo<\/li>\n<li>Parent Component<\/li>\n<\/ul>\n<\/td><\/tr><tr><td><strong>Quantity<\/strong><\/td><td>Quantity of Items or Components in the Job Estimate.<\/td><\/tr><tr><td><strong>Cost UoM<\/strong><\/td><td>Cost of the Item or Component<\/td><\/tr><tr><td><strong>Extension<\/strong><\/td><td>Calculated extension of the Item or Component (Quantity multiplied by Unit of Measure). Additionally, total extension for the entire Cost Center is calculated.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>The report also calculates the total cost of the Job Estimate based on the sum of all Cost Centers.<\/p>\n\n\n\n<p>For the Take Off Parameters style, the report will look as follows:<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" width=\"1256\" height=\"793\" src=\"\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-top-materials.png\" alt=\"\" class=\"wp-image-1711\" srcset=\"https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-top-materials.png 1256w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-top-materials-300x189.png 300w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-top-materials-1024x647.png 1024w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-top-materials-768x485.png 768w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-bill-of-materials-top-materials-1200x758.png 1200w\" sizes=\"(max-width: 1256px) 100vw, 1256px\" \/><\/figure><\/div>\n\n\n\n<p>The report shows the following information:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Take Off Parameter<\/strong><\/td><td>Name of the Take Off Parameter.<\/td><\/tr><tr><td><strong>Value<\/strong><\/td><td>Value of the Take Off Parameter.<\/td><\/tr><\/tbody><\/table><\/figure>","protected":false},"excerpt":{"rendered":"<p>The Job Bill of Materials report can show the list of Cost Centers (summary or detailed view) or the summary of all Take Off Parameters for a specific Job Estimate in the form of a Bill of Materials. Open the library with reports. Select Job Bill of Materials. Define criteria&#8230;<\/p>","protected":false},"author":21,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"ht-kb-category":[55,95],"ht-kb-tag":[],"class_list":["post-1707","ht_kb","type-ht_kb","status-publish","format-standard","hentry","ht_kb_category-estimating-reports","ht_kb_category-needs-update"],"_links":{"self":[{"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb\/1707"}],"collection":[{"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb"}],"about":[{"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/types\/ht_kb"}],"author":[{"embeddable":true,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/comments?post=1707"}],"version-history":[{"count":2,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb\/1707\/revisions"}],"predecessor-version":[{"id":7862,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb\/1707\/revisions\/7862"}],"wp:attachment":[{"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/media?parent=1707"}],"wp:term":[{"taxonomy":"ht_kb_category","embeddable":true,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb-category?post=1707"},{"taxonomy":"ht_kb_tag","embeddable":true,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb-tag?post=1707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}