{"id":1891,"date":"2019-04-19T15:49:31","date_gmt":"2019-04-19T15:49:31","guid":{"rendered":"https:\/\/builder-help.gjgardner.com\/?page_id=1891"},"modified":"2021-11-05T23:39:17","modified_gmt":"2021-11-05T23:39:17","slug":"job-scheduled-handover-date","status":"publish","type":"ht_kb","link":"http:\/\/help.gjgardner.com\/nz\/hc\/reports\/schedules-reports\/job-scheduled-handover-date\/","title":{"rendered":"Job Scheduled Handover Date Report"},"content":{"rendered":"<p>The Job Scheduled Handover Date report provides a historical overview of the scheduled Job Handover Date and its change throughout the construction period. The report includes the following types of Jobs:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>not completed<\/li><li>not finalized<\/li><li>in the Proceeding state<\/li><li>ones that have a Schedule Start Date<\/li><\/ul>\n\n\n\n<ol class=\"wp-block-list\"><li>Open the library with reports.<\/li><li>Select <strong>Job Scheduled Handover Date<\/strong>.<\/li><li>Define criteria for generating the report, as follows:<br>\n<table width=\"623\">\n<tbody>\n<tr>\n<td width=\"217\"><strong>Start Date<\/strong><\/td>\n<td width=\"406\">Select the start date of the Construction Schedule for the Job. This start date will be used for report generation.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<figure><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1892\" src=\"\/wp-content\/uploads\/2019\/04\/job-scheduled-handover-date-options.png\" alt=\"\" width=\"299\" height=\"156\"><\/figure><p><\/p>\n<\/li><li>When complete, click <strong>Apply<\/strong>. The report is generated, as follows:<\/li><\/ol>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" width=\"1447\" height=\"857\" src=\"\/wp-content\/uploads\/2019\/04\/job-scheduled-handover-date.png\" alt=\"\" class=\"wp-image-1893\" srcset=\"https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-scheduled-handover-date.png 1447w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-scheduled-handover-date-300x178.png 300w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-scheduled-handover-date-1024x606.png 1024w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-scheduled-handover-date-768x455.png 768w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/04\/job-scheduled-handover-date-1200x711.png 1200w\" sizes=\"(max-width: 1447px) 100vw, 1447px\" \/><\/figure><\/div>\n\n\n\n<p>The report shows the following information:<\/p>\n\n\n\n<div class=\"wp-block-ht-blocks-toggle wp-block-hb-toggle\"><div class=\"wp-block-hb-toggle__title\"><span>Report Information<\/span><\/div><div class=\"wp-block-hb-toggle__content\"><div class=\"wp-block-hb-toggle__contentwrap\"><figure class=\"wp-block-table is-style-regular\"><table><tbody><tr><td><strong>Job<\/strong><\/td><td>Job number including the Office\u2019s number as prefix.<\/td><\/tr><tr><td><strong>Client<\/strong><\/td><td>Name of the Client that the Job attributes to.<\/td><\/tr><tr><td><strong>Date<\/strong><\/td><td>Weekly periods from the selected start date. Each weekly period shows the Job Handover Date and its change throughout the Job construction.<\/td><\/tr><tr><td><strong>Movement<\/strong><\/td><td>&nbsp;<\/td><\/tr><\/tbody><\/table><\/figure><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>The Job Scheduled Handover Date report provides a historical overview of the scheduled Job Handover Date and its change throughout the construction period. The report includes the following types of Jobs: not completed not finalized in the Proceeding state ones that have a Schedule Start Date Open the library with&#8230;<\/p>","protected":false},"author":21,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"ht-kb-category":[58],"ht-kb-tag":[],"class_list":["post-1891","ht_kb","type-ht_kb","status-publish","format-standard","hentry","ht_kb_category-schedules-reports"],"_links":{"self":[{"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb\/1891"}],"collection":[{"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb"}],"about":[{"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/types\/ht_kb"}],"author":[{"embeddable":true,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/comments?post=1891"}],"version-history":[{"count":3,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb\/1891\/revisions"}],"predecessor-version":[{"id":7900,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb\/1891\/revisions\/7900"}],"wp:attachment":[{"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/media?parent=1891"}],"wp:term":[{"taxonomy":"ht_kb_category","embeddable":true,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb-category?post=1891"},{"taxonomy":"ht_kb_tag","embeddable":true,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb-tag?post=1891"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}