{"id":667,"date":"2019-03-06T17:36:53","date_gmt":"2019-03-06T17:36:53","guid":{"rendered":"https:\/\/builder-help.gjgardner.com\/?page_id=667"},"modified":"2021-11-11T19:31:39","modified_gmt":"2021-11-11T19:31:39","slug":"draw-rules","status":"publish","type":"ht_kb","link":"http:\/\/help.gjgardner.com\/nz\/hc\/setup\/accounting-settings\/draw-rules\/","title":{"rendered":"Draw Rules"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Draw Rules contain business rules that are used for calculation of progress payment amounts. The system links Jobs to a specific Draw Rule.<\/span><\/p>\n\n\n\n<p><span style=\"font-weight: 400;\">Draw Rules are identified by a unique code (comprised of up to 10 characters) and a Description.<\/span><\/p>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">To manage Draw Rules, on the navigational sidebar, select <\/span><b>Setup<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Once the Setup section expands, select <\/span><b>Accounting<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the tabbed menu, select <\/span><b>Draw Rules<\/b><span style=\"font-weight: 400;\">. The Draw Rules page loads, as follows:<\/span><span style=\"font-weight: 400;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-670\" src=\"\/wp-content\/uploads\/2019\/03\/setup-accounting-draw-rules.png\" alt=\"\" width=\"1176\" height=\"723\" srcset=\"https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/setup-accounting-draw-rules.png 1176w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/setup-accounting-draw-rules-300x184.png 300w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/setup-accounting-draw-rules-1024x630.png 1024w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/setup-accounting-draw-rules-768x472.png 768w\" sizes=\"(max-width: 1176px) 100vw, 1176px\" \/><\/span><\/li><\/ol>\n\n\n\n<p><span style=\"font-weight: 400;\">Here you can see the list of Draw Rules. For each Draw Rule, you can view the following information:<\/span><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><b>Rule<\/b><\/td><td><span style=\"font-weight: 400;\">Unique code of a Draw Rule.<\/span><\/td><\/tr><tr><td><b>Description<\/b><\/td><td><span style=\"font-weight: 400;\">Description of a Draw Rule.<\/span><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><span style=\"font-weight: 400;\">You can perform the following operations on Draw Rules:<\/span><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><span style=\"font-weight: 400;\">add new Draw Rules<\/span><\/li><li><span style=\"font-weight: 400;\">edit the existing Draw Rules<\/span><\/li><li><span style=\"font-weight: 400;\">clone the existing Draw Rules<\/span><\/li><li><span style=\"font-weight: 400;\">delete the no longer needed Draw Rules<\/span><\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><b>Creating a New Draw Rule<\/b><\/h2>\n\n\n\n<ol class=\"wp-block-list\"><li><span style=\"font-weight: 400;\">Above the list with Draw Rules, locate the <\/span><b>Add&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-204 alignnone\" src=\"\/wp-content\/uploads\/2019\/02\/create-icon.png\" alt=\"\" width=\"15\" height=\"20\"><\/b> <span style=\"font-weight: 400;\"> icon and click it. The Create Draw Rule page opens, as follows:<\/span><span style=\"font-weight: 400;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-673\" src=\"\/wp-content\/uploads\/2019\/03\/create-draw-rule.png\" alt=\"\" width=\"1475\" height=\"721\" srcset=\"https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/create-draw-rule.png 1475w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/create-draw-rule-300x147.png 300w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/create-draw-rule-1024x501.png 1024w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/create-draw-rule-768x375.png 768w, https:\/\/help.gjgardner.com\/wp-content\/uploads\/2019\/03\/create-draw-rule-1200x587.png 1200w\" sizes=\"(max-width: 1475px) 100vw, 1475px\" \/><\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the <\/span><b>Create Draw Rule<\/b><span style=\"font-weight: 400;\"> page, specify the following information about a Draw Rule:<\/span><br>\n<table>\n<tbody>\n<tr>\n<td><b>Rule<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Enter a unique code of a Draw Rule.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Description<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Enter description of a Draw Rule.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Draw Basis<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Select the way how the Draw Rule links to the Job Schedule. Select the appropriate option, as follows:<\/span>\n<p>&nbsp;<\/p>\n<ul>\n<li style=\"font-weight: 400;\"><b>Critical Path<\/b><span style=\"font-weight: 400;\"> &#8211; the Draw is due when all tasks in the linked Critical Path have been flagged as Done. <\/span><\/li>\n<li style=\"font-weight: 400;\"><b style=\"font-weight: 400;\">Cost&nbsp;<\/b><span style=\"font-weight: 400;\"><b>Centre<\/b> &#8211; the Draw is due when the task for the selected Cost Center (in the Critical Path) has been flagged as Done.<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Manage stages in the Draw Rule.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">When complete, click <\/span><b>Save<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><\/ol>\n\n\n\n<h2 class=\"wp-block-heading\"><b id=\"Managing_Stages_in_the_Draw_Claim_Rule\">Managing Stages in the Draw Rule<\/b><\/h2>\n\n\n\n<p><span style=\"font-weight: 400;\">Each Draw Rule is comprised of stages that are automatically numbered by the system. For each stage, the following information is displayed:<\/span><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><b>Number<\/b><\/td><td><span style=\"font-weight: 400;\">Ordinal number of the stage in the Draw Rule. This number is assigned automatically by the system.<\/span><\/td><\/tr><tr><td><b>Description<\/b><\/td><td><span style=\"font-weight: 400;\">Description of the stage in the Draw Rule.<\/span><\/td><\/tr><tr><td><b>Deposit<\/b><\/td><td><span style=\"font-weight: 400;\">Flag that the stage is the deposit stage.<\/span><\/td><\/tr><tr><td><b>Amount Due, $<\/b><\/td><td><span style=\"font-weight: 400;\">Amount Due for this stage. Usually only the Deposit stage has an amount. If the Percent Due is used, this value will be empty.<\/span><\/td><\/tr><tr><td><b>Percent Due, %<\/b><\/td><td><span style=\"font-weight: 400;\">Percent Due for this stage. If the Amount Due is used, this value will be empty.<\/span><\/td><\/tr><tr><td><b>Deduct Deposit<\/b><\/td><td><span style=\"font-weight: 400;\">Flag which indicates that the amount for the Deposit stage should be deducted from the Draw amount when it is calculated. This would normally apply to the stage immediately after the deposit stage.<\/span><\/td><\/tr><tr><td><b>Critical Path<\/b><\/td><td><span style=\"font-weight: 400;\">Critical Path which applies to the stage. Each Draw Stage is normally due when a Construction Critical Path has been completed. The Critical Path description which shows contains the Critical Path Sequence (a number 1, 2, &#8230;). For the Stages where you have selected a critical path, the Sequences must be ascending order.<\/span><\/td><\/tr><tr><td><b>Budget Percent<\/b><\/td><td><span style=\"font-weight: 400;\">Percentage of the job budget (for example, Job Estimate Cost) which will be budgeted to incur during this Draw Stage.<\/span><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><span style=\"font-weight: 400;\">You can perform the following operations on stages of Draw Rules:<\/span><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">add stages into a Draw Rule<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">remove stages from a Draw Rule<\/span><\/li><\/ul>\n\n\n\n<p><b>Note<\/b><\/p>\n\n\n\n<pre class=\"wp-block-preformatted\"><span style=\"font-weight: 400;\">Only non-deleted Critical Paths are listed in the drop down list. A problem can arise when a Critical Path is deleted and pointed to a substitute critical path. The Draw Rules which use the deleted Critical Path are NOT automatically updated. However, when you select a Draw Rule where this is a problem a warning message appears requesting you to correct the problem ASAP.<\/span><\/pre>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Adding Stages into the Draw<\/strong><strong> Rule<\/strong><\/h3>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Above the top right part of the list with stages, locate the <\/span><b>Add&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-247 alignnone\" src=\"\/wp-content\/uploads\/2019\/03\/quote-add-icon.png\" alt=\"\" width=\"20\" height=\"14\"><\/b>&nbsp;<span style=\"font-weight: 400;\">icon and click it. A stage row appears on the list. Add as many as needed rows.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Specify the following information about each stage:<\/span><br>\n<table>\n<tbody>\n<tr>\n<td><b>Number<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Ordinal number of the stage in the Draw Rule. This number is assigned automatically by the system.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Description<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Enter description of the stage in the Draw<\/span><span style=\"font-weight: 400;\"> Rule.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Deposit<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Check the box to indicate that the stage is at the deposit stage.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Amount Due, $<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Enter the Amount Due for the Deposit stage only. Skip entering any value for other stages.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Percent Due, %<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Enter the Percent Due for stages different from the Deposit stage. Avoid entering any percent If you have already specified Amount Due for the stage.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Deduct Deposit<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Check the box to indicate that the amount for the Deposit stage should be deducted from the Draw amount when it is calculated. This would normally apply to the stage immediately after the deposit stage.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Critical Path<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Select the Critical Path which applies to the stage.<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Cost Center<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Select the Cost Center which applies to the stage. Selection of the Cost Center becomes available when you select it &nbsp;<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Budget Percent<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Enter the percentage of the job budget (for example, Job Estimate Cost) which will be incurred during this Draw Stage.<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/li><li><span style=\"font-weight: 400;\">For each stage, specify the stage paragraph.<\/span><\/li><li><span style=\"font-weight: 400;\">When complete, click <\/span><b>Save<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><\/ol>\n\n\n\n<p><span style=\"font-weight: 400;\">Please consider additional validation rules imposed by the system:<\/span><\/p>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">The sum of the percent values in the Percent Due column for specific stages should equal 100%. You will not be able to save the Draw Rule if it differs.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">The sum of the percent values in the Budget Percent column for specific stages should equal 100%. You will not be able to save the Draw Rule if it differs.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">The values selected in the Critical Path for specific stages should go in the ascending order.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Each stage from the draw rule should have a state paragraph.<\/span><\/li><\/ol>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Deleting Stages from the Draw Rule<\/strong><\/h3>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the list with stages within the Draw Rule, locate the one you want to remove.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Hover over the stage until the action icons appear.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Click the <\/span><b>Remove<\/b>&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-255 alignnone\" src=\"\/wp-content\/uploads\/2019\/03\/remove-icon.png\" alt=\"\" width=\"16\" height=\"10\">&nbsp;<span style=\"font-weight: 400;\">icon.<\/span><\/li><\/ol>\n\n\n\n<h2 class=\"wp-block-heading\"><b>Editing the Draw Rule<\/b><\/h2>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the list with Draw Rules, locate the one you want to edit.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Hover over the Draw Rule until the action icons appear.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Click the <\/span><b>Edit&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-188 alignnone\" src=\"\/wp-content\/uploads\/2019\/02\/edit-icon.png\" alt=\"\" width=\"15\" height=\"15\"><\/b>&nbsp;<span style=\"font-weight: 400;\">icon.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Make the appropriate modifications in the Draw Rule.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">When complete, click <\/span><b>Process<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><\/ol>\n\n\n\n<h2 class=\"wp-block-heading\"><b>Deleting the Draw Rule<\/b><\/h2>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the list with Draw Rules, locate the one you want to delete.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Hover over the Draw Rule until the action icons appear.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Click the <\/span><b>Delete&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-206 alignnone\" src=\"\/wp-content\/uploads\/2019\/02\/delete-icon.png\" alt=\"\" width=\"12\" height=\"16\"><\/b> <span style=\"font-weight: 400;\"> icon.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Confirm the removal of the Draw Rule.<\/span><\/li><\/ol>\n\n\n\n<h2 class=\"wp-block-heading\"><b>Cloning the Draw Rule<\/b><\/h2>\n\n\n\n<ol class=\"wp-block-list\"><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">On the list with Draw Rules, locate the one you want to clone.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Hover over the Draw Rule until the action icons appear.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Click the <\/span><b>Clone&nbsp;<img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-256 alignnone\" src=\"\/wp-content\/uploads\/2019\/03\/clone-icon.png\" alt=\"\" width=\"19\" height=\"22\"><\/b> <span style=\"font-weight: 400;\"> icon. The Create Draw Rule page opens.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Specify the missing information for the cloned Draw Rule.<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">When complete, click <\/span><b>Process<\/b><span style=\"font-weight: 400;\">.<\/span><\/li><\/ol>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Draw Rules contain business rules that are used for calculation of progress payment amounts. The system links Jobs to a specific Draw Rule. Draw Rules are identified by a unique code (comprised of up to 10 characters) and a Description. To manage Draw Rules, on the navigational sidebar, select Setup&#8230;.<\/p>","protected":false},"author":21,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"ht-kb-category":[213],"ht-kb-tag":[],"class_list":["post-667","ht_kb","type-ht_kb","status-publish","format-standard","hentry","ht_kb_category-accounting-settings"],"_links":{"self":[{"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb\/667"}],"collection":[{"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb"}],"about":[{"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/types\/ht_kb"}],"author":[{"embeddable":true,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/comments?post=667"}],"version-history":[{"count":4,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb\/667\/revisions"}],"predecessor-version":[{"id":7934,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb\/667\/revisions\/7934"}],"wp:attachment":[{"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/media?parent=667"}],"wp:term":[{"taxonomy":"ht_kb_category","embeddable":true,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb-category?post=667"},{"taxonomy":"ht_kb_tag","embeddable":true,"href":"https:\/\/help.gjgardner.com\/nz\/wp-json\/wp\/v2\/ht-kb-tag?post=667"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}