The Construction Critical Path report shows the list of Cost Centers that are mapped to a specific Critical Path stage.
- Open the library with reports.
- Select Construction Critical Path. The report is generated, as follows:

The report shows the following information:
| Critical Path | Name of the Critical Path stage. |
| Cost Center | Name and number of the Cost Center within each Critical Path stage. |